CMiC Field - Document Management

Overview

The Document Log can be used to maintain and revise all types of documents such as drawings, specifications, and bulletins. Each type of document has its own node on the Treeview. Submittals and submittal packages are also included in the Document Management node.

Documents that have already been defined can be added to items such as communications, RFIs, transmittals, or any other screen that has an Attachments tab.

New documents can also be added to the Document Log via the Attachments tab on most screens by pressing the [Upload New] button. This will create revision 0 of any new document.

Revisions to documents can only be done via the Document Log screen. Whenever a document is attached to an object, the user can select the required revision.